必发365

Service Hotline:0335-7168696
News
News
News

Requirements for selection of aluminum die project

Time:2022-10-28 10:43:31View count:



When the aluminum die is used, there are certain requirements for the floor height, external frame, structural form and appearance structure.


◆ Floor height


The aluminum alloy formwork shall be preferentially selected with a floor height of 2.8-3.2 meters, which is more than 3.2 meters. The traditional method of adding cross bars and cross bridging is required.


◆ Outer frame


The combination of aluminum formwork and external climbing frame is the best construction method. If the outrigger is cantilevered, special treatment is required for formwork design, manufacturing and on-site installation, which is costly and difficult to construct.


◆ Structural form


Shear wall structure and frame shear wall structure are the best, while other structures have more masonry walls, so the advantage of using aluminum mold is not obvious.


◆ Appearance structure


There are not many contour lines and changes are not complicated



必发365官网(中国)乐趣网投天天必发
必发365官网(中国)乐趣网投天天必发
必发365官网(中国)乐趣网投天天必发
必发365官网(中国)乐趣网投天天必发
网站地图网站地图
友情链接:asiagame  leyu  mansion88  老哥俱乐部  bifa必发  尊龙凯时  新利体育luck18  鸿运国际  leyu  ca88  尊龙凯时  ca88